Facelift access and safety made easy

Call us now on 0844 22 54 360

Facelift 31st Anniversary

Facelift news by email

Get our latest news stories by email, as soon as they're published.

A tight squeeze!

A tight squeeze!

27 September 2013 Email this article

Whatever the access challenge, we’ve got a piece of kit to suit. Just take a look at one of our machines enabling a team to carry out under-bridge inspection work in Cornwall.

Our operator, Robert Roach, is using a Moog MBI 120. Created for this very purpose, it allows bridge inspections on a dual carriageway to take place in one pass, therefore reducing traffic management costs and job time by half. It has a platform that can be extended by up to 12 metres, and a hydraulic drive system that allows the platform to be moved with razor-fine precision, even whilst fully extended.

It was a tight squeeze, but the Moog MBI 120 was the perfect piece of kit to get the job done.